Skip to content
CronusIQ

Install

Get started in a day.

Practical steps to put CronusIQ on your shop network, connect CNCs, and see live monitoring — without a six-month enterprise rollout.

  1. 1

    Order / create account

    Sign up or place an order for the machines you want to monitor. You’ll get login credentials and a short onboarding checklist for your shop network.

    • Pick Base or Everything plan
    • List machine count and controls
    • Invite an admin user
  2. 2

    Deploy edge device on shop network

    Place the CronusIQ edge appliance (or approved gateway) on the same LAN/VLAN as your CNCs. Keep outbound access for updates if cloud sync is enabled; air-gapped options available.

    • DHCP or static IP
    • Firewall allowlist as needed
    • Confirm reachability to machine ports
  3. 3

    Connect machines (MTConnect / FOCAS / OPC-UA)

    Add each CNC in admin. Choose the protocol your control supports — MTConnect, Fanuc FOCAS, or OPC-UA — and verify live status. Most shops are cutting with live data the same day.

    • Haas, Mazak, Okuma, DMG, Fanuc
    • Test one machine first
    • Name cells for grouping
  4. 4

    See the live dashboard

    Open the shop-floor board on office browsers or TV displays. Dark TV mode for the floor, light mode for the office — utilization, downtime, and OEE on every card.

    • Pin a TV URL
    • Set alert thresholds
    • Walk the board in standup
  5. 5

    Optional: operator tablet, shifts, users

    Roll out operator tablets for downtime reason codes, configure shift calendars for OEE, and invite supervisors and viewers with role-based access.

    • Tablet kiosk mode
    • Align shifts to payroll
    • Operators vs viewers

Need a guided install?

We’ll walk your team through edge deploy, first machine connect, and dashboard setup on a short call.

Demo